Plan the Project Before You Hire the Contractor
A planning method for storage and cabinetry projects: define the outcome, set a budget forward, get comparable drawings, verify the company, and decide with the drawings before the prices.
Last updated
2 min readDisclosure: This website may receive compensation from companies featured on this site. Carolina Building Services has a commercial relationship with the publisher. Read the full disclosure.
Home upgrades get expensive quickly, and most of the expense that is regretted later was decided before the first quote — in what was asked for, in the order things were done, and in quotes that were never comparable. This is the planning desk's method for storage and cabinetry projects. It takes an evening.
Define the outcome, not the product
'A closet that holds everything with the dresser gone' is an outcome; 'a closet system' is a product. Write the outcome and the must-haves. Our storage & closets, kitchen & pantry, garage and laundry & mudroom sections help you write it.
Set the budget forward
Decide the finish level (laminate, painted, veneer) and the must-haves, then let those set the budget, rather than picking a number and letting a template fill it. Hold roughly a tenth in reserve. Our sister site's how to set a closet remodeling budget walks through it.
Get drawings, not estimates
A dimensioned drawing is the unit of comparison. Get two or three from different kinds of company — a local shop, a national brand, a retail option — for the same must-haves and finish level.
Verify the company
- Physical address and working phone
- Where components are made and by whom
- Materials, with a sample
- Warranty document, in writing
- Lead time and installation scope, in writing
- Who installs, and what happens with out-of-square walls
Our local contractors page shows what a verified profile looks like: every fact with a source and a date, and 'not verified' where we could not confirm.
Compare drawings before prices
Adjust drawings to match (same drawer count, same finish) before comparing dollars. Two prices for different drawings tell you nothing.
Decide, then stop changing
Change orders after approval cost more than decisions before it. Make the last decision at the drawing stage.
Order of operations for a whole-house storage plan
- Primary closet — the highest daily return.
- Garage-entry hall or mudroom — the most visible household improvement.
- Pantry — especially in newer homes with deep wire shelves.
- Garage — after the mudroom, because it takes the mudroom's overflow.
- Guest rooms, laundry, office — as budget and patience allow.
Get all of them drawn at once if a company will do it; drawings do not expire and a whole-house plan avoids rebuilding the mudroom to fit a later garage.
When you do need a general contractor
Storage and cabinetry projects that move walls, add plumbing or change electrical circuits beyond a fixture need a licensed contractor and, often, a permit. Closet systems, pantry shelving, lockers and built-ins that attach to existing walls usually do not. When in doubt, ask the installer what their scope excludes and confirm permit requirements with your jurisdiction; this site does not give code advice.
Frequently asked questions
How many quotes should I get for a storage project?
Two or three, from different kinds of company, for the same drawing.
Should I pay for a design?
Many companies design free as part of a quote; confirm whether a fee applies if you do not proceed.
What is the most common planning mistake?
Comparing prices for drawings that are not the same.